Search engine :
Return to the menu
Vote:
Results:
1 Votes
JULY 2019 - Volume: 94 - Pages: 359
Download pdf
In industry there are problems which are recommended to be solved by mathematical models of optimization. The waiting time for lack of supply of materials to the production lines is one of them and is specifically, the problem that was sought to solve within an automotive industrial organization through the new methodology proposed for the generation of mathematical models of optimization.
Share:
© Engineering Journal Dyna 2006 - Publicaciones Dyna, S.L
Official Science and Technology Body of the Federation of Industrial Engineers' Associations
Address: Unit 1804 South Bank Tower, 55 Upper Ground, London UK, SE1 9EY
Email: office@revistadyna.com
Regístrese en un paso con su email y podrá personalizar sus preferencias mediante su perfil
Name: *
Surname 1: *
Surname 2:
Email: *